Fleebs-Logo
Details werden geladen...

MP's Ujjain Simhastha 2028 Preparations Spark Row As Saints Oppose Alleged Selective Ashram Demolitions, Demand Consultation And Offer Space For Fair Arrangements

Around a dozen Mahamandaleshwars and religious leaders in MP's Ujjain formed a panel opposing alleged selective demolition of ashrams ahead of Simhastha 2028. Meeting divisional commissioner Asheesh Singh, they demanded prior consultation and a list of unauthorised structures. The saints offered to help identify obstructions and provide ashram premises for fair arrangements.

Ähnliche Seiten

https://www.freepressjournal.in/indore/11-houses-demolished-in-mps-ujjain-for-simhastha-2028-preparations-total-demolitions-reach-83-amid-hariphatak-over-bridge-widening

11 Houses Demolished In MP's Ujjain For Simhastha 2028 Preparations, Total Demolitions Reach 83 Amid Hariphatak Over-Bridge Widening

https://www.freepressjournal.in/indore/11-houses-demolished-in-mps-ujjain-for-simhastha-2028-preparations-total-demolitions-reach-83-amid-hariphatak-over-bridge-widening
https://www.freepressjournal.in/indore/simhastha-2028-preparations-gain-momentum-in-mps-ujjain-as-uda-indian-overseas-bank-sign-643-crore-loan-mou-for-temple-ghat-and-pilgrim-infrastructure

Simhastha 2028 Preparations Gain Momentum In MP's Ujjain As UDA, Indian Overseas Bank Sign ₹643 Crore Loan MoU For Temple, Ghat And Pilgrim Infrastructure

https://www.freepressjournal.in/indore/simhastha-2028-preparations-gain-momentum-in-mps-ujjain-as-uda-indian-overseas-bank-sign-643-crore-loan-mou-for-temple-ghat-and-pilgrim-infrastructure