Mumbai Metro Safety: Bombay HC Seeks MMRDA Report After 7 Accidents At 3 Project Sites
The Bombay High Court has directed MMRDA to submit a safety report after seven accidents were reported at Metro 2B, Metro 4 and Metro 9 construction sites between February 14 and October 17. The authority has three weeks to respond. The PIL followed a February accident in Mulund in which a concrete parapet collapsed during Metro construction.