Mumbai-Nanded Vande Bharat Delayed 32 Minutes After OHE Fault In Kasara-Igatpuri Ghat Section
The train came to a halt between 4.35 pm and 5.07 pm after an OHE insulator failed to hold properly in the Kasara–Igatpuri section. The defect affected power supply to the electric train, prompting an immediate response from railway maintenance teams.