Login

Willkomen zurück, bitte gebe deine Zugangsdaten ein!

Passwort vergessen

Anmeldung erfolgt in Kürze...
Fleebs-Logo
Details werden geladen...

Bhopal’s Ambedkar Setu Develops Defects Again; PWD To Recover Entire Repair Cost From Contractor

The PWD will recover the entire cost of repairing Bhopal’s Ambedkar Setu, along with 20% compensation, from contractor VKSC Infra Projects Limited. Officials detected bearing-coat and rainwater drainage problems during the monsoon. The High Court has stayed a fresh Rs 4.69-crore tender and directed the contractor to rectify the shortcomings.