Login

Willkomen zurück, bitte gebe deine Zugangsdaten ein!

Passwort vergessen

Anmeldung erfolgt in Kürze...
Fleebs-Logo
Details werden geladen...

Peak Hour Commute On Harbour Line Disrupted Briefly After Technical Fault In OHE Between CSMT & Wadala

Mumbai's Harbour Line local train services were disrupted during Tuesday's evening rush hour following an overhead electrification (OHE) fault between CSMT and Wadala. The disruption began at 7.11 pm, delaying trains towards Panvel and Goregaon and inconveniencing thousands of commuters. The up line was restored at 7.18 pm and the down line at 7.27 pm, with services gradually normalising.

Videos

Peak Hour Commute On Harbour Line Disrupted Briefly After Technical Fault In OHE Between CSMT & Wadala
5 Minuten 2 Sekunden

Peak Hour Commute On Harbour Line Disrupted Briefly After Technical Fault In OHE Between CSMT & Wadala

Mumbai Infrastructure Round-Up: New Marina, Atal Setu Connector, GTB Nagar & Aqua Line Update
6 Minuten 43 Sekunden

Mumbai Infrastructure Round-Up: New Marina, Atal Setu Connector, GTB Nagar & Aqua Line Update

Ähnliche Seiten

https://www.freepressjournal.in/mumbai/mumbai-local-trains-western-railway-uses-fifth-line-to-beat-thambivali-halt-between-borivali-and-kandivali

Mumbai Local Trains: Western Railway Uses Fifth Line To Beat ‘Thambivali’ Halt Between Borivali And Kandivali

https://www.freepressjournal.in/mumbai/mumbai-local-trains-western-railway-uses-fifth-line-to-beat-thambivali-halt-between-borivali-and-kandivali