Flood-swept vehicle plugs tunnel mouth, saves 40 workers - The Times of India
TRISHULI BAZAAR: Forty workers trapped 3.5km inside the 216MW Upper Trishuli-1 Hydropower Project miraculously survived the Aug 26 flood after a vehicle swept in by the torrent got wedged near the tunnel mouth and blocked the worst of the mud and debris from rushing inside.